Or actually, it's mo problems, mo money for us :(
The good news is that structural engineer came in and determined what was needed in order to have a safe home and a bathroom that could support the 1300 lbs pounds of tile and a tub full of water as well as also correcting what could have caused additional problems in the future.
The bad news is it added a good amount of money to the renovation and made us increase the budget.
The good news is that structural engineer came in and determined what was needed in order to have a safe home and a bathroom that could support the 1300 lbs pounds of tile and a tub full of water as well as also correcting what could have caused additional problems in the future.
The bad news is it added a good amount of money to the renovation and made us increase the budget.
Picture of the contractors installing new floor supports. You could also see the second bathroom on the second floor :).
Here are all new floor supports. Glued and Screwed (Just like Mike Holmes Likes It) to the old supports
Installed new header in first floor dining room entrance. This sits right below master bathroom.
Installed new header on the first floor future powder room. This sits below both bathrooms on second floor.
No comments:
Post a Comment