The Structural engineered came today, looked at everything and provided an engineering report.  The bad news is that we'll need to fix the structure in every floor, not just the 2nd floor.  Right now we'll focus on the areas around the second floor bath.  So looks like we'll need wood, wood, and more wood.  




HOWEVER, some good things happened today too!!!  The Washer and Dryer were delivered.  We bought an LG washer and dryer. We've never had our own washer and dryer in our old place because it was an apartment so now Lauren thinks Life's Good (ha)


ALSO delivered, 1300 Lbs of Bianco Carrera Marble Tile.